This gap must be ventilated at the top i e.
Pitched roof air gap.
If you are constructing a ventilated roof insulating between and under the rafters then there needs to be a 50 mm air gap between the insulation and the sarking felt to avoid condensation building up.
Kingspan with a warm roof the usual process is to split the insulation into two layers.
Ventilated roofs require a 50 mm air gap above the insulation timber stop battens can be nailed into the side of the rafters to give the correct air gap when.
It is important that air is allowed to circulate between the roof covering and the insulation to avoid condensation a gap of at least 50mm 2 inch must be left between the insulation and the inside of the roof covering.
If 180mm is to be installed then 100mm board might be introduced between the rafters there has to be a minimum 25mm air gap between the insulation and the underside of.
The map at right which is based on table r806 4 of the irc lists the minimum r values required to prevent condensation in unvented assemblies in various climate zones.
An air gap in the rafters is not required as long as there is a channel for water drainage to run down the roof this can be achieved with counter battens that run vertically down the roof.
At the ridge and also at the bottom either through vents at the eaves or.
An unvented roof assembly is possible only if you keep the roof sheathing warm enough to prevent conditioned air from condensing against it.
There will also be kooltherm k7 pitched roof board between the rafters image credit.